Nashville's Kitchen & Bath — Middle Tennessee We respond immediately
Home Kitchen Remodeling Bathroom Remodeling Tile Showers & Tub Conversions Cabinets & Countertops Walls, Islands & Layout Changes Refresh Projects Service Area Splashback About Get a Free Estimate

Kitchen & Bath Contractor · Nashville, TN

Kitchen and bathroom remodeling in Nashville, TN

Full kitchen and bathroom remodels, tile showers, cabinetry and countertops from a licensed Nashville contractor who finishes when they said they would.

We respond immediately Licensed and insured local crews Free, no-obligation estimates

Estimate request

Which room is it, and what bothers you about it?

Straight to us, and a reply the same day.

Free, no obligation. We never sell your information: what happens to it.

Nashville's Kitchen & Bath

Nashville's Kitchen & Bath is a kitchen and bath remodeling contractor based in Nashville, Tennessee, working 65 towns across 12 counties of Middle Tennessee. Kitchen and bath contractors who finish the design and the price before the sledgehammer, and finish the job with the same crew that started it.

More about who we are, what we commit to, and who answers for this site.

What we fix

The kitchen or bath you work around every day

Recognize one? You are in the right place.

  • Layout fights you every day
  • Cabinets are dated or failing
  • Tile or grout is failing
  • Wall closes the kitchen off
  • Tub nobody ever uses
  • Selling and these rooms date the house

How it works

Drawn, then priced, then demolished, in that order

  1. Tell us what is happening

    Send the form; describe it in your own words.

  2. Get a free written estimate

    One of our kitchen and bath contractors looks at the work and gives you a scope and a price in writing, with no obligation to go ahead.

  3. We do the work

    Agreed price, tidy site, workmanship in writing. Not right afterwards? We come back.

Why trust us

One crew from the layout to the punch list, on paper

There are no finished-kitchen galleries from a stock library and no quoted customers this brand has not had; the proof will be real remodels, shown as owners agree.

  • Finish the design first

    Layout, cabinets, tile, fixtures and lighting chosen and priced before demolition, so the number does not move.

  • Order before demolishing

    Cabinets and tile on hand before the old kitchen comes out; the gap between the two is where remodels stall.

  • Run the punch list

    The last five percent is the part most contractors leave, and it is in the contract with a date.

  • Allowance the finishes

    An allowance is a price that will go up; the real tile and the real faucet are in the quote.

  • Move plumbing without a permit

    A drain moved without inspection fails the next home inspection and sometimes the floor.

  • Start what cannot be finished

    If the lead time on the countertop is six weeks, the demolition waits five.

Middle Tennessee

What Nashville houses hide behind old tile and cabinets

The single most requested job across Middle Tennessee right now is opening the wall between kitchen and living space in houses built from the 1970s through the 1990s. Those homes are structurally sound and generously sized but were laid out as separate rooms, and the wall in question is frequently load-bearing — which means a header, sometimes a point load carried down to the foundation, and a permit. It is an excellent change and it is not a cosmetic one.

On the bathroom side, the pattern is just as consistent: converting the builder-standard tub-shower in a primary suite into a walk-in shower. In the large late-1990s and 2000s subdivisions across Williamson, Rutherford and Sumner County these bathrooms were built to a very consistent plan, and what is behind the tile is usually a mortar pan and a plastic liner now at the end of its life — so what looks cosmetic is a full rebuild once the tile is off.

Service area

Kitchens and baths remodeled out to the county lines

We remodel kitchens and baths in Nashville and in 64 more towns spread over 12 counties. If the house sits anywhere in Middle Tennessee an hour’s drive or less from Nashville, our crew will come to it.

FAQ

Kitchen and bath remodeling: the questions that come up first

How much does kitchen and bathroom remodeling cost in Nashville?

A Nashville kitchen or bath is priced by what moves — plumbing, walls, electrical — before it is priced by the finishes, and the honest quote separates the two so you can see where the money goes.

How fast can you get someone out?

A design visit in Nashville is usually within a week or two; the build itself starts when the cabinets and tile are on hand, because a demolished kitchen waiting on a delivery is the worst way to live for a month.

What areas do you cover?

Remodelers taking Nashville kitchens and baths also work Franklin, Brentwood, Murfreesboro, Hendersonville — 65 towns across 12 counties.

Are you licensed and insured?

Every remodeler on our crews holds the Tennessee contractor’s license required at the job’s value, carries liability insurance, and uses licensed plumbers and electricians for the trades that need them — all on file with us.

Do you charge for an estimate?

No — free, written, and no obligation.

What if something goes wrong afterwards?

Send the form; the workmanship is backed in writing.

How long does a kitchen remodel take?

Six to twelve weeks for a full kitchen once demolition starts, and longer if walls move or cabinets are custom. Most of that is not labor: semi-custom cabinets commonly run six to ten weeks from order, and inspections between trades set the pace. The usable-kitchen gap is typically three to five weeks in the middle, which is worth planning for rather than discovering.

What drives the cost of a kitchen or bathroom remodel?

Cabinetry and layout changes, more than finishes. Stock cabinets versus custom is often the single largest line. Moving plumbing or gas means opening floors and walls, and on a slab that means cutting concrete. Countertops are priced by material and square footage plus edge and cutout work. Tile is priced by the labor to set it, so a small mosaic costs far more per foot than a large-format tile.

Can I use my kitchen during the remodel?

Not the kitchen itself, but you can plan around it. Most households set up a temporary kitchen elsewhere with the fridge, microwave and kettle before demolition. A contractor who sequences well can keep the fridge running for most of the job. Expect dust beyond the work area regardless of protection, and plan the timing around anything you host.

Should I replace or reface cabinets?

Reface when the boxes are solid, the layout works and only the doors and finish are dated — it costs substantially less and takes days rather than weeks. Replace when the layout is wrong, the boxes are particleboard that has swelled, or you want different sizes and configurations. Refacing a bad layout leaves you with the same kitchen in a different color.

What bathroom remodel mistakes are most expensive?

Moving the toilet drain, skipping waterproofing behind tile, and undersizing ventilation. Waterproofing is invisible and the failure shows up two years later as a leak into the room below — it is the single most common bathroom callback. An extractor fan that is undersized or vents into the attic rather than outside creates the mold problem the remodel was supposed to solve.

Free estimate

Ready to stop working around that room?

Send Nashville's Kitchen & Bath the room, its measurements if you have them and what bothers you about it. We come out, look behind what we can, and put a written estimate on the table with nothing owed for it.

We respond immediately Get a Free Estimate