Kitchen & Bath Contractor · Nashville, TN
Kitchen Remodeling in Nashville
Design through final trim — cabinets, counters, appliances, lighting, flooring and the plumbing and electrical behind them.
Estimate request
Which room is it, and what bothers you about it?
Straight to us, and a reply the same day.
Kitchen Remodeling in Nashville, Tennessee
Design through final trim — cabinets, counters, appliances, lighting, flooring and the plumbing and electrical behind them.
Nashville's Kitchen & Bath does kitchen remodeling for homeowners across Middle Tennessee — licensed, insured, with the price in writing before the work starts. Kitchen and bath contractors who finish the design and the price before the sledgehammer, and finish the job with the same crew that started it.
Why homeowners call
Why a homeowner calls about this room
- Layout fights you every day
- Cabinets are dated or failing
- Tile or grout is failing
- Wall closes the kitchen off
- Tub nobody ever uses
- Selling and these rooms date the house
What is included
Everything inside the kitchen remodeling price
- Design, selections and a written scope before demolition
- Cabinetry, countertops, tile, flooring and lighting
- Plumbing and electrical brought current and inspected
- Appliance coordination including panel-ready and built-in units
- Load-bearing walls opened with an engineered header where required
- A written schedule with phases you can plan around
How a kitchen remodeling job runs, demo to final wipe-down
The schedule is driven by cabinet lead time and by the week between countertop template and installation. Knowing that up front is the difference between a project that feels organized and one that feels stalled, and it is why selections finish before demolition starts rather than during it.
Keeping the plumbing and gas where they are keeps a kitchen affordable. Moving a sink or a range, particularly on a slab, is what turns a substantial refresh into a substantial remodel, and we will price both so the choice is yours rather than assumed.
Also available
More of what our remodel crew handles
Bathroom Remodeling
Down to the studs and back — layout, plumbing, waterproofing, tile, vanity, lighting and ventilation as one job.
Learn moreTile Showers & Tub Conversions
Fully waterproofed shower systems with a proper pan, and unused tubs converted to walk-in showers.
Learn moreCabinets & Countertops
New cabinetry, refacing and refinishing, with quartz or granite templated after the boxes are set rather than before.
Learn moreWalls, Islands & Layout Changes
Load-bearing walls opened with an engineered header, islands added, and the layout reworked so the room functions.
Learn moreRefresh Projects
Paint, hardware, lighting, counters and fixtures for rooms that need updating rather than rebuilding.
Learn moreService area
Kitchens and baths remodeled out to the county lines
We remodel kitchens and baths in Nashville and in 64 more towns spread over 12 counties. If the house sits anywhere in Middle Tennessee an hour’s drive or less from Nashville, our crew will come to it.
FAQ
What homeowners ask about kitchen remodeling
How long does a kitchen remodel take?
Six to twelve weeks of construction for a full remodel, after several weeks of design and ordering — cabinets alone are often six to ten weeks out. The kitchen is out of use for most of construction, so a temporary setup elsewhere in the house is planned for. A schedule with the trades sequenced properly is what keeps twelve weeks from becoming twenty.
What is the most expensive part of a kitchen remodel?
Cabinets, then countertops, then labor — and the hidden cost is anything that moves. Keeping the sink, range and refrigerator where they are keeps the plumbing and electrical simple; moving them means new lines, new circuits and often a permit. A layout that stays put is the single biggest lever on the total.
Free estimate
Ready to price your kitchen remodeling?
Send Nashville's Kitchen & Bath the room, its measurements if you have them and what bothers you about it. We come out, look behind what we can, and put a written estimate on the table with nothing owed for it.